Field
|
Description
|
||||||||
---|---|---|---|---|---|---|---|---|---|
Status
|
Indicates whether the best fit recommendation is approved or not.
|
||||||||
Allocated
Allocated Original
|
Client-driven value usually meaning that a part is on hand but already committed to another requirement.
Allocated Original is the value from the host system, and Allocated is the rolled up value.
|
||||||||
Amount Custom (1-10)
|
Custom fields for amounts derived from the IPCS_STOCK_AMOUNT table.
|
||||||||
Annual Demand
|
Actual forecasted demand for the next year including any scheduled or non-recurring adjustments used in calculating the Economic Order Quantity.
|
||||||||
Annual Value
|
Annual Demand * Part Cost
|
||||||||
Approved
|
Indicates whether or not the recommended forecast is approve.
|
||||||||
Backorder
Backorder Original
|
The original backorder amount that came from the host system.
|
||||||||
Bad Available In Future
|
Future returns of bad parts using NFF rates OR future amounts coming from down-chain parts on bad orders depending on how roll up flags (roll up good, roll up bad, or roll good as bad) are set. Calculated as In Return * (1 - NFF).
|
||||||||
Calculated Repair Max
|
Internal field storing the Repair Stock Maximum quantity as calculated by the system. This can be different from Repair Max if the Repair Max Override value is entered.
|
||||||||
Calculated Repair ROP
|
Internal field storing the Repair ROP as calculated by the system. This can be different than ROP if the ROP Override value is entered.
|
||||||||
Calculated ROP
|
Internal field storing the ROP as calculated by Servigistics. This can be different than ROP if the ROP Override value is entered.
|
||||||||
Calculated Safety Stock
|
Internal field storing the Safety Stock quantity as calculated by the system. This can be different from Safety Stock if a Safety Stock Override value is entered.
|
||||||||
Calculated Stock Max
|
Internal field storing the Stock Maximum quantity as calculated by Servigistics. This can be different from Stock Max if the Stock Max Override value is entered.
|
||||||||
Carry Cost Override
|
The override amount if the Carrying Cost recommendation has been overridden somewhere in Servigistics.
|
||||||||
Composite Error
|
|||||||||
Current Forecast Method/ID
|
Method used to generate current forecasted data.
|
||||||||
Current MAD
|
MAD using current forecasted data.
|
||||||||
Current MAPE
|
MAPE using current forecasted data.
|
||||||||
Current RMSE
|
RMSE using current forecasted data.
|
||||||||
Cushion Time
|
The difference in days between the Need By Date and the Expected Date. A negative Cushion Time means you will need stock before you are scheduled to receive it.
Cushion Time = Need By Date - Expected Date
|
||||||||
Custom Level (1-5)
|
Custom fields for levels derived from the IPCS_STOCK_LEVEL table.
|
||||||||
Days On Hand
|
This is calculated based on the GENERATE_OP_SL_OUTSTOCK_DAYS global setting.
• When the global setting is set to false, the Days On Hand value is calculated by Stock Levels process as
(On Hand New + On Hand Fixed)/ Average Daily Demand Rate)
• When the global setting is set to true, the Days on Hand value is calculated as follows:
◦ For customers using Stock Levels process, iplan will still calculate the Days On Hand value as:
(On Hand New + On Hand Fixed)/ Average Daily Demand Rate)
◦ For Time Phased pairs: Days on Hand is based on when the planned On-Hand Good goes below zero. It relies on the Planned On Hand Good goes below 0 review reason.
◦ For Trigger pairs, Days On Hand is calculated as:
(On Hand New + On Hand Fixed)/ Average Daily Demand Rate)
When Forecast is zero, then Days on Hand is displayed as a blank
• Where Average Daily Demand Rate is defined as:
◦ If level source is MEO/SIO (Inventory Optimization) then the Average Daily Demand Rate is equal to IPCS_STOCK_LEVEL.OptDailyDmdRate
◦ If level source is Levels then the Average Daily Demand Rate is equal to IPCS_STOCK_LEVEL.SLDemandPerDay
|
||||||||
Demand Satisfaction Override
|
The override amount if the Demand Satisfaction recommendation has been overridden somewhere in Servigistics.
|
||||||||
Effective Composite Error
|
Current Composite Error.
|
||||||||
EOQ
|
The Economic Order Quantity (EOQ) is the optimum quantity of goods to be purchased at one time in order to minimize the cost of ordering and holding items in inventory. The two main variables in the Economic Order Quantity (EOQ) calculation are:
• Order Cost
• Carrying Cost (also known as Holding Cost)
At any order point (be it one piece or one thousand pieces), by adding the Carrying Cost per part with the Order Cost per part, you get the total cost of that part.
|
||||||||
Expected Date
|
The date an order is expected to be received if the procurement order is placed today.
Expected Date = Today's Date + Pipeline Length
|
||||||||
Forecast Method/ID
|
Forecast method identified as best fit candidate.
|
||||||||
Forecast Stream
|
Stream used for Best Fit Analysis (Install, Promotional, Exceptional, or Normal).
|
||||||||
Forecast Stream ID
|
System-generated ID assigned to the forecast stream used for Best Fit Analysis.
|
||||||||
Good Available in Future
|
Future returns of bad parts using NFF rates OR future amounts coming from down-chain parts on bad orders depending on how roll up flags (roll up good, roll up bad, or roll good as bad) are set. Calculated as In Return * (1 - NFF).
|
||||||||
In Repair
In Repair Original
|
Client-driven value - usually means the number of parts actually in process - also known as Repair WIP (Work in Process).
In Repair Original is the value from the host system, and In Repair is the rolled up value.
|
||||||||
In Repair Bad
In Repair Bad Original
|
Client-driven value - usually means material in repair and not yet repaired.
In Repair Bad Original is the value from the host system, and In Repair Bad is the rolled up value.
|
||||||||
In Repair Good
In Repair Good Original
|
Client-driven value - usually means material still in repair but already repaired.
In Repair Good Original is the value from the host system, and In Repair Good is the rolled up value.
|
||||||||
In Return
In Return Original
|
Client-driven value - usually means bad material returned for exchange or repair under an RMA (Return Material Authorization). In some cases this is the sum of In Return Bad and In Return Good.
In Return Original is the value from the host system, and In Return is the rolled up value.
|
||||||||
In Return Bad
In Return Bad Original
|
Client-driven value - usually means bad material returned for exchange or repair under an RMA (Return Material Authorization).
In Return Bad Original is the value from the host system, and In Return Bad is the rolled up value.
|
||||||||
In Return Good
In Return Good Original
|
Client-driven value - usually means good material returned for exchange under an RMA (Return Material Authorization).
In Return Good Original is the value from the host system, and In Return Good is the rolled up value.
|
||||||||
Is ASL Item
|
Yes indicates that the part is on the Authorized Stock List; No indicates that the part is NOT on the Authorized Stock List.
|
||||||||
Last Order Date
|
The date of the last order for the selected part at the location.
|
||||||||
Last Order Quantity
|
The quantity of the last order for the selected part at the location.
|
||||||||
Location
|
The name of the location.
|
||||||||
Location Active
|
Yes indicates that the location is active and is to be included in planning.
|
||||||||
Location Critical
|
Yes indicates that the location is critical. Used for segmentation.
|
||||||||
Location Custom (1-10)
|
Custom fields for locations derived from the IPCS_LOC_MASTER table.
|
||||||||
Location Description (1-5)
|
The description of the location for the order recommendation. Note that more than one field is provided to use for different languages.
|
||||||||
Location ID
|
System-driven integer identification number for the location related to the order recommendation.
|
||||||||
Location Type
|
The type of location (for example, Sales Market) for the order recommendation.
|
||||||||
Lot Size
|
The smallest available order quantity multiple for a given part.
|
||||||||
MAD
|
Current Mean Absolute Deviation, which is a statistical measure of fit (only calculated with new period).
|
||||||||
MAPE
|
Current MAPE, only calculated with new period.
|
||||||||
Measure of Effectiveness Used
|
The measure of effectiveness used to calculate the optimal levels for the SKU.
|
||||||||
Minimum Order Quantity
|
The least quantity of this part that may be ordered at a time.
|
||||||||
Need By Date
|
The expected backorder count at the stocking location.
|
||||||||
Networks
|
A set of related locations, defined on the Networks page. Networks allow balancing of excess quantities of On Hand stock to be limited to the selected Locations that are within the Network. Locations outside of the Network are not balanced.
|
||||||||
On Hand Bad
On Hand Bad Original
|
The number of bad parts in stock at this location that are awaiting a repair order. Separate stock from In Repair, for which a repair order is in progress.
On Hand Bad Original is the value from the host system, and On Hand Bad is the rolled up value.
|
||||||||
On Hand Fixed
On Hand Fixed Original
|
Client-driven value - usually means available stock that has previously been repaired (for the purposes of identifying stock that cannot legally be resold as new).
On Hand Fixed Original is the value from the host system, and On Hand Fixed is the rolled up value.
|
||||||||
On Hand Good
|
The sum of On Hand New and On Hand Fixed.
|
||||||||
On Hand New
On Hand New Original
|
Available stock that can be legally sold as new. For some customers, this may include On Hand Fixed quantities.
On Hand New Original is the value from the host system, and On Hand New is the rolled up value.
|
||||||||
On Order
On Order Original
|
Client-driven value - usually means the quantity expected at the location of a given part from a supplier.
On Order Original is the value from the host system, and On Order is the rolled up value.
|
||||||||
Order Cost
Reference Order Cost
Reference Order Cost Currency
|
Order Cost is the cost to order the part in your local currency.
Reference Order Cost/Currency is the Order Cost in the reference value/currency.
Click here for more information about local and reference currency.
|
||||||||
Order Cost Override
Reference Order Cost Override
Reference Order Cost Override Currency/ID
|
Order Cost Override is the override amount in your local currency if the Order Cost recommendation has been overridden somewhere in Servigistics.
Reference Order Cost Override/Currency is the Order Cost Override in the reference value/currency.
Click here for more information about local and reference currency.
|
||||||||
Out of Stock Date
|
The date when On Hand Good will be zero at the current demand rate.
Out Of Stock Date = Today + (30 * (On Hand Good) / Forecast)
|
||||||||
Part Active
|
Yes indicates that the part is active and is to be included in planning.
|
||||||||
Part Cost
Reference Cost
Reference Cost Currency
|
Part Cost is the amount paid to acquire the part in your local currency.
Reference Cost/Currency is the Part Cost in the reference value/currency.
Click here for more information about local and reference currency.
|
||||||||
Part Critical
|
Yes indicates that the part is critical. Used for segmentation.
|
||||||||
Part Custom (1-20)
|
Custom fields for parts derived from the IPCS_PART_MASTER table.
|
||||||||
Part Description
|
The description of the part.
|
||||||||
Part Family
|
The family to which a part belongs (such as hard drive, monitor, etc.). Used for segmentation.
|
||||||||
Part ID
|
The ID of the part for the order recommendation.
|
||||||||
Part Name (1-5)
|
The name of the part for the order recommendation. Note that more than one field is provided to use for different languages.
|
||||||||
Part Number
|
The number of the part for the order recommendation.
|
||||||||
Part Repairable
|
Yes indicates that the part is repairable.
|
||||||||
Part Serializable
|
Yes indicates that the part can have a serial number.
|
||||||||
Part Type
|
The type of part. Used for segmentation.
|
||||||||
Planner Code
|
The Planner Code assigned to the part.
|
||||||||
Planner Name
|
The user name of the planner assigned to the part.
|
||||||||
Procurement Length
|
The length of the Procurement pipeline - the number of days it takes to get new parts to field locations from central locations.
|
||||||||
Procurement Length Override
|
The override amount the Procurement Length recommendation has been overridden somewhere in Servigistics.
|
||||||||
Procurement Requested Amount
Procurement Requested Original
|
The quantity of a part requested for procurement.
Procurement Requested Original is the value from the host system, and Procurement Requested Amount is the rolled up value.
|
||||||||
Procurement SD Override
|
The override amount the Procurement Standard Deviation recommendation has been overridden somewhere in Servigistics.
|
||||||||
Re-Order Point
|
The specific inventory position level at which a Procurement or Replenishment order is triggered for the SKU.
• A ROP of -1 indicates that the SKU is not stocked.
• The ROP is aggregated for a single period on the Part Summary, Location Summary, and Scenario Summary pages.
• The ROP is calculated as a forecast weighted average over multiple time periods on the Part Budget Summary and Scenario Budget Summary pages.
• The ROP is for the Scenario on the Time Series container of the Stocking Policy page
|
||||||||
Region
|
The geographic area to which a location is assigned. Regions are defined on the Regions page and can be used for aggregation and other configurations such as segmentation.
|
||||||||
Repair Cost
Reference Repair Cost
Reference Repair Cost Currency
|
Repair Cost is the cost to repair a part in your local currency. (Used in calculating Repair EOQ.)
Reference Repair Cost/Currency is the Repair Cost in the reference value/currency.
Click here for more information about local and reference currency.
|
||||||||
Repair EOQ
|
The Repair Economic Order Quantity for repairable parts.
|
||||||||
Repair Length Override
|
The override amount if the Repair Length recommendation has been overridden somewhere in Servigistics.
|
||||||||
Repair Max
|
The largest allowable repair stock.
The Repair Stock Maximum value is calculated depending on the condition:
|
||||||||
Repair Max Override
|
The override amount the Repair Maximum recommendation has been overridden somewhere in Servigistics.
|
||||||||
Repair Order Cost
Reference Repair Order Cost
Reference Repair Order Cost Currency
|
The cost to process one repair order.
Reference Repair Order Cost/Currency is the Repair Order Cost in the reference value/currency.
Click here for more information about local and reference currency
|
||||||||
Repair Order Cost Override
Reference Repair Order Cost Override
Reference Repair Order Cost Override Currency/ID
|
Repair Order Cost Override is the override amount in your local currency if the Repair Order Cost recommendation has been overridden somewhere in Servigistics.
Reference Repair Order Cost Override/Currency is the Repair Order Cost Override in the reference value/currency.
Click here for more information about local and reference currency.
|
||||||||
Repair Requested Amount
Repair Requested Original
|
The quantity requested for repair.
Repair Requested Original is the value from the host system, and Repair Requested Amount is the rolled up value.
|
||||||||
Repair ROP
|
The point at which a repair order is triggered for the repairable part associated with the scenario. It is the amount of stock consumed between today and after an order placed today could arrive.
|
||||||||
Repair ROP Override
|
The override amount the Repair ROP recommendation has been overridden somewhere in Servigistics.
|
||||||||
Repair SD Override
|
The override amount the Repair Standard Deviation recommendation has been overridden somewhere in Servigistics.
|
||||||||
Repair Wash Rate
|
Repair recommendation quantities are factored by the Repair Wash Rate (which is a percentage). For example, if the Repair Wash Rate = 10% and 10 good units are required to meet demand, then 11 units of on hand bad will be required and assumed used on the assumption that one unit will wash out during the repair process.
|
||||||||
Repair Wash Rate Override
|
The override amount if the Repair Wash Rate recommendation has been overridden somewhere in Servigistics.
|
||||||||
Replenish Order Cost Override
Reference Replenishment Order Cost Override
Reference Replenishment Order Cost Override Currency/ID
|
Replenish Order Cost Override is the override amount in your local currency if the Replenishment Order Cost recommendation has been overridden somewhere in Servigistics.
Reference Replenishment Order Cost Override/Currency is the Replenish Order Cost Override in the reference value/currency.
Click here for more information about local and reference currency.
|
||||||||
Replenishment Order Cost
Reference Replenishment Order Cost
Reference Replenishment Order Cost Currency
|
Replenishment Order Cost is the cost to replenish the part in your local currency.
Reference Replenishment Order Cost/Currency is the Replenishment O rder Cost in the reference value/currency.
Click here for more information about local and reference currency.
|
||||||||
Replenishment Requested Amount
Replenish Requested Original
|
The quantity requested for replenishment.
Replenish Requested Original is the value from the host system, and Replenishment Requested Amount is the rolled up value.
|
||||||||
Replenishment Length Override
|
The override amount if the Replenishment Length recommendation has been overridden somewhere in Servigistics.
|
||||||||
Replenishment SD Override
|
The override amount if the Replenishment Standard Deviation recommendation has been overridden somewhere in Servigistics.
|
||||||||
Return Length Override
|
The override amount if the Return Length recommendation has been overridden somewhere in Servigistics.
|
||||||||
Return SD Override
|
The override amount if the Return Standard Deviation recommendation has been overridden somewhere in Servigistics.
|
||||||||
Return Wash Rate
|
Return Wash Rate is a factor (percentage) used to forecast returns. Forecasted returns are normally used in time-phased planning to project on hand bad quantities. It is normally calculated as: Forecast * (1 - Return Wash Rate)
|
||||||||
Return Wash Rate Override
|
The override amount if the Return Wash Rate recommendation has been overridden somewhere in Servigistics.
|
||||||||
RMSE
|
Current Root Mean Square Error, which is a statistical measure of fit (only calculated with new period).
|
||||||||
ROP Override
|
The override amount if the ROP recommendation has been overridden somewhere in Servigistics.
|
||||||||
Safety Stock
|
The stock held in excess of the requirements to buffer for uncertainty during lead time. Calculated as Round ( (ROP - Pipeline Forecast) / Customer Order Size)) * Customer Order Size
|
||||||||
Safety Stock Override
|
The override amount if the Safety Stock recommendation has been overridden somewhere in Servigistics.
|
||||||||
SKU Custom (1-15)
|
Custom fields for SKUs derived from the IPCS_SKU table.
|
||||||||
Stock Maximum
|
The maximum inventory level that can be stocked for a SKU at any time. Calculated as ROP + Effective Order Quantity.
• A Stock Maximum of 0 indicates that the SKU is not stocked.
• The Stock Maximum is aggregated for a single period on the Part Summary, Location Summary, and Scenario Summary pages.
• The Stock Maximum is calculated as a forecast weighted average over multiple time periods on the Part Budget Summary and Scenario Budget Summary pages.
• The Stock Maximum is for the Scenario on the Time Series container of the Stocking Policy page
|
||||||||
Stock Maximum Override
|
The override amount if the Stock Maximum recommendation has been overridden somewhere in Servigistics.
|