Field
|
Description
|
---|---|
Carry Cost
|
The percentage of part value equaling the annual cost to hold that part in inventory, including the costs of depreciation, insurance, facilities, time value of money, etc.
|
Delay Until Date
|
When a SKU Reviewed or Part Reviewed action is performed on the Work Queue page or the Review Board container on the Interactive Planner Worksheet page, the record is hidden until this date. It is calculated as follows:
• If the Delay Days for the Review Type is populated on the Review Parameters page, the Delay Until Date is set to the current date plus the Delay Days.
• If the Delay Days for the Review Type is not populated on the Review Parameters page, the Delay Until Date is set to the system date plus the number of days specified by the REVIEWED_ACTION_DELAY_DAYS global setting.
|
Like Location
|
Used if the location is new and has no demand history. This similar location will be used to estimate demand for the location.
|
Like Part
|
Used if the part is new and has no demand history. This similar part will be used to estimate demand for the part.
|
Location Active
|
Yes indicates that the location is active and is to be included in planning.
|
Location Critical
|
Yes indicates that the location is critical to the operation.
|
Location Custom (1-10)
|
Custom fields for locations derived from the IPCS_LOC_MASTER table.
|
Location Description (1-5)
|
The description of the location. Note that more than one field is provided to use for different languages.
|
Location Name
|
The name of the location.
|
Location Status
|
The status of the location.
|
Location Type
|
The type of location.
|
Networks
|
A set of related locations, defined on the Networks page. Networks allow balancing of excess quantities of On Hand stock to be limited to the selected Locations that are within the Network. Locations outside of the Network are not balanced.
|
Order Cost
|
The sum of the internal overhead costs involved in the acquisition of a part, including selecting vendors, generating purchase orders, paying the invoice, etc.
|
Part Active
|
Yes indicates that the part is active and is to be included in planning.
|
Part Cost
Reference Cost
Reference Cost Currency
|
Part Cost is the amount paid to acquire a part.
Reference Cost/Currency is the Part Cost in the reference value/currency.
Click here for more information about local and reference currency.
|
Part Critical
|
Yes indicates that the part is critical. Used for segmentation.
|
Part Custom (1-20)
|
Custom fields for parts derived from the IPCS_PART_MASTER table.
|
Part Description
|
The description of the part.
|
Part Family
|
The family to which a part belongs (such as hard drive, monitor, etc.). Used for segmentation.
|
Part Name (1-5)
|
The name of the part. Note that more than one field is provided to use for different languages.
|
Part Number
|
The number of the part.
|
Part Type
|
The type of part. Used for segmentation.
|
Priority
|
The priority order of the review type for the Review Board record, which is set in Review Subscriptions.
|
Region
|
The geographic area to which a location is assigned. Regions are defined on the Regions page and can be used for aggregation and other configurations such as segmentation.
|
Repair Cost
|
Repair Cost is the cost to repair a part in your local currency. (Used in calculating Repair EOQ.)
|
Repair Order Cost
|
The cost to process one repair order.
|
Repairable
|
Yes indicates that the part is repairable.
|
Replenishment Order Cost
|
The sum of the internal overhead costs involved in the replenishment of a part.
|
Review Comment
|
A review comment is a note about the review reason. Review comments are added to a review reason using the record's action buttons.
If a review comment was added to the review reason, it is displayed in this field.
|
Review Date
|
The date the Review Board record was generated.
|
Review Name
|
The name of the Review Board record, which corresponds to the Review Type number.
|
Review Note
|
The description of the Review Board record.
|
Review Type
|
A part/location exception defined on the Review Types page. The name of the review type describes the evaluation that is performed against each part/location record. If the evaluation is true, then that part/location appears on the Review Board.
|
Total Forecast Cost
|
The current slice's forecast multiplied by the part price. For example, if the forecast for the slice is 5.0 units and the price per unit is $10.00, the Total Forecast cost is $50.00.
Total Forecast Cost allows the items to be ranked by current forecast cost allowing you to see "big ticket" items first.
|
Unit of Measure
|
Indicates how Weight per Unit is measured (i.e., pounds, grams, liters, etc.).
|
Weight Per Unit
|
The weight of one unit in the selected Unit of Measure (pounds, grams, liters, etc.).
|