The percentage of units in repair that are not be able to be repaired. For example:
• Repair Wash Rate = 10%
• 10 good units are required to meet demand
The repair recommended quantity will be 11 units of On Hand Bad, as the calculation will assume that one unit (10%) will wash out during the repair process.