Reference Materials
>
Core Topics
>
Scheduling Batch Reports
Scheduling Batch Reports
Reports can be scheduled to run at a later time and/or date or on a fixed schedule using the AutoPilot.
Schedule AutoPilot to run using jobs
.
Was this helpful?
This site works best with JavaScript enabled