Supply Planning > Supply Planning Configuration > Disassembly Setup > Disassembly Setup Page (Fields)
Disassembly Setup Page (Fields)
These are the fields that appear on the page.
Field
Description
Available End Date
The last day of the date range that the parts acquired from the disassembly will be available for usage.
Available Start Date
The first day of the date range that the parts acquired from the disassembly will be available for usage.
Include In Analysis
Yes indicates that the disassembly will be included in the product disassembly analysis.
Location
The location that includes the product to be disassembled.
Priority
Used to set the order in which product candidates are evaluated for product disassembly analysis. Priority lets a part in multiple products be evaluated in a predefined sequence.
The highest priority number is evaluated first. This means that a product with a disassembly record with a higher priority (like 5) is going to be evaluated before a product with a disassembly record with a lower priority (like 4).
Product Name
The product to be disassembled.
Quantity
The number of the selected product to be disassembled.
Was this helpful?