Field
|
Description
|
---|---|
Available End Date
|
The last day of the date range that the parts acquired from the disassembly will be available for usage.
|
Available Start Date
|
The first day of the date range that the parts acquired from the disassembly will be available for usage.
|
Include In Analysis
|
Yes indicates that the disassembly will be included in the product disassembly analysis.
|
Location
|
The location that includes the product to be disassembled.
|
Priority
|
Used to set the order in which product candidates are evaluated for product disassembly analysis. Priority lets a part in multiple products be evaluated in a predefined sequence.
The highest priority number is evaluated first. This means that a product with a disassembly record with a higher priority (like 5) is going to be evaluated before a product with a disassembly record with a lower priority (like 4).
|
Product Name
|
The product to be disassembled.
|
Quantity
|
The number of the selected product to be disassembled.
|