The expected cost of unsatisfied demands. Calculated as (1 - Fill Rate) * Interval Customer Forecast * Stockout Unit Cost (Fill Rate)
For comparison fields, there are three values shown per field:
• (A) — The value from the first scenario selection
• (B) — The value from the compare scenario selection
• (Delta) — The difference between the two selections