wwID0EJQPVC,wwID0EMRPVC
Glossary
>
—R—
> ROP (days)
ROP (days)
The acronym for
R
e
o
rder
P
oint (days)
The
ROP
in terms of days. Calculated as
ROP / Total Daily Forecast
•
If
ROP
is
-1
, then the
ROP (days)
will be
0
•
If
Total Daily Forecast
is zero or missing, then the
ROP (days)
will also be
0
for non-stocked items
Used in the calculation of these fields
Maximum ROP (days)
Minimum ROP (days)
Appears on these pages
•
Part Supply Chain
•
SKU Detail Report
•
SKU Summary
•
Stocking Policy
Was this helpful?
This site works best with JavaScript enabled