wwID0ENH5AD
Glossary
>
—P—
>
Price/Cost Change Configuration
Price/Cost Change Configuration
The difference between the
Price/Cost A
and
Price/Cost B
, for up to ten (10) configurations as defined on the
Price/Cost Change Configuration
page. Calculated as
Price/Cost A – Price/Cost B
Appears on these pages
•
Price Actions
◦
Single Level
tab
•
Pricing Policy
◦
Details
section of the
Results
tab
•
Pricing Worksheet
◦
Price/Cost Change
section of the
Price/Cost/Margin
tab
Was this helpful?
This site works best with JavaScript enabled