Churn Control Method
The method of churn control. Valid options are:
• None — Churn control is not run as part of the calculation process.
• Use Inventory Balance with Reference Scenario — Use the most recently calculated non-churn scenario with the same scenario attributes (such as periods to be optimized, the same forecast source, optimization set, etc).
• Use Inventory Balance — Current inventory balance will be used first, and condemned forecast will be used for inventory burn down throughout the optimization horizon.
• Respect Production — ROP constraints can be set based on production values.
• Respect Previous Period —ROP constraints can be set based on optimization results from immediate prior optimization period.
|
When using Churn Control Parameters on a scenario you can configure the parameters to allow a ROP = -1 to increase to 0 and a ROP = 0 to increase to 1 by setting a high control or threshold limit of greater than 100% for a Respect Production Parameter.
When the INVENTORY_OPTIMIZATION_MODE global setting is set to SIO, the Churn Control field is disabled.
|