Actual Receive Date
The actual date the part is received. These dates are downloaded from the host, usually on a daily basis. The first time Order Plan creates an order these values will be blank (null). This field can be modified.
|
If there are not actual dates downloaded, Servigistics will use an estimated projected date based on lead time information and calendars.
|
Appears on these pages