Glossary > —A— > Actual Available Date
Actual Available Date
The actual date the part is ordered. These dates are downloaded from the host, usually on a daily basis. The first time Order Plan creates an order these values are blank (null). This field can be modified.
* 
If there are no actual dates downloaded, an estimated projected date, based on lead time information and calendars, is used.
Appears on these pages 
Was this helpful?